One Engineering Input. Four Synchronized Core Tools in 15 Seconds.
01 / 05 • Core-Tool CascadeUpdating a single specification automatically cascades across your Process Flow, 7-Step PFMEA, Control Plan, and Operator Work Instructions.
1. Master Process Flow
OP-30 Precision Forming
2. 7-Step Reverse PFMEA
Failure Mode & AP Updated
3. Multi-Stage Control Plan
Gauge & Sample Freq Locked
4. Operator QR Tablet WI
Live Revision Alert Pushed
KEY-REL-10 | OP-30 | SPEC: 38.10 +/- 0.10mm | SEV:8 OCC:2 DET:2 | SHA-256: 9F86D081884C
Proprietary 19-Schema Architecture Protected
5-Way Setup Verification & Automated Perishable Tool Lockout.
02 / 05 • Setup & Tool InterlockPrevent scrap before Piece #1 runs. Operators verify Master samples, active revisions, gauge calibration, tooling cycle life, and CNC checksums.
Gate 1 & 2
Master Sample & Active Rev
Gate 3 (Calibration & Wear)
Mandrel / Tool Cycle Limit
Gate 4 (Competency)
Operator Matrix & Vision
Gate 5 (Media Control)
CNC Checksum & First-Off Cpk
CHK-8.5-01 | GATE-03 MANDREL SHOT LIMIT | AUTO-LOCKOUT TRIGGER ARMED | ZERO BYPASS
Instant OP-20 Machine Interlock Hold
Start From Scratch or Bridge Across Standards in One Click.
03 / 05 • Cert Delta BridgeMaintain one unified workflow while switching clause readiness between ISO 9001, IATF 16949 (PPAP), AS9100D (AS9102 FAIR), ISO 14001, and ISO 45001.
Baseline → Target
ISO 9001 → IATF 16949
Automotive → Aerospace
IATF 16949 → AS9100D
QMS → Full EHS
+ ISO 14001 & ISO 45001
Controlled Documentation
26 Clause 4–10 Master SOPs
CL.8.1.4 COUNTERFEIT | CL.8.5.1.3 AS9102 REV C FAIR | NADCAP LOCK | OASIS V3
Cross-Standard Clause Matrix Protected
Automated 8D, 6M Fishbone & 3-Tier Scrap Cost Segregation.
04 / 05 • Prescriptive CAPA & COPQIngest daily ERP shift exports to segregate CAT-1/2/3 scrap while auto-drafting 30-Day Quality Alerts, 6M Fishbones, and 3-Legged 5-Whys.
D3 Containment
30-Day Quality Alert
D4 Root Cause
6M Fishbone & 3x5-Why
D7 Preventative
Reverse Cascade to CP/WI
Financial COPQ Ledger
OEE % vs. True Scrap $
FIN-9.1-COPQ | CAT-1 REVERIFY | CAT-2 MRB QUARANTINE | CAT-3 TERMINAL SCRAP
Deterministic PFMEA-to-8D Engine
Live on Your Toughest Production Line in 14 Days.
05 / 05 • Rapid Turnkey RolloutZero disruption to your existing ERP. Hosted in a dedicated Canadian Sovereign Cloud vault (Montreal ca-central-1) with Row-Level Security.
14-Day Pilot Strike
1 Primary Production Line
30-Day Full Rollout
Plant-Wide Multi-Standard
Data Sovereignty
AWS Montreal (ca-central-1)
Executive Verification
2FA PIN & SHA-256 Audit Log
RLS-TENANT-ISOLATED | AWS-CA-CENTRAL-1 | ZERO-TRUST OTP | 2FA SHA-256 VERIFIED
Canadian Sovereign Cloud Protected